Esg

A PHP Error was encountered

Severity: Notice

Message: Undefined index: post_shortdesc

Filename: detail/index.php

Line Number: 85

Backtrace:

File: /www/wwwroot/timah.imajiku.net/application/modules_front/post/views/detail/index.php
Line: 85
Function: _error_handler

File: /www/wwwroot/timah.imajiku.net/application/third_party/MX/Loader.php
Line: 361
Function: include

File: /www/wwwroot/timah.imajiku.net/application/third_party/MX/Loader.php
Line: 300
Function: _ci_load

File: /www/wwwroot/timah.imajiku.net/application/third_party/template/libraries/Template_front.php
Line: 750
Function: parse

File: /www/wwwroot/timah.imajiku.net/application/third_party/template/libraries/Template_front.php
Line: 714
Function: _load_view

File: /www/wwwroot/timah.imajiku.net/application/third_party/template/libraries/Template_front.php
Line: 224
Function: _find_view

File: /www/wwwroot/timah.imajiku.net/application/controllers/Base_front.php
Line: 374
Function: build

File: /www/wwwroot/timah.imajiku.net/application/modules_front/post/controllers/Post.php
Line: 1281
Function: display

File: /www/wwwroot/timah.imajiku.net/index.php
Line: 317
Function: require_once

Reclamation and Post-mining Rehabilitation

We recognize that open pit mining has a direct impact on the surrounding environment, with one of the consequences being the loss of vegetation that can affect oxygen availability and reduce carbon sequestration capacity. Therefore, we carry out the reclamation process as an effort to improve the land ecosystem and protect flora and fauna species.

During the reporting period, there were mine closures in several locations based on the results of the mining operation performance inspection by the Production Operations team. The division managing the post-mining rehabilitation is the HSE and Sustainability Division. The Company carries out post-mining reclamation practices by referring to the Minister of Energy and Mineral Resources Decree No. 1827K/30/MEM 2018 Appendix VI, containing Guidelines for the Implementation of Reclamation and post-mining and post-operation activities in mineral and coal mining businesses. The process of mine closure planning to post-mining reclamation is supervised through a mechanism that is routinely reported to the authorities following prevailing regulations.

Onshore Mine Reclamation

Post-mining management that has been prepared by the end of 2023 is respectively for the Bangka Regency IUP area, West Bangka Regency IUP, Central Bangka Regency IUP, South Bangka Regency IUP, Belitung Regency IUP, East Belitung Regency IUP, and Cross Regency IUP. Our Onshore reclamation is carried out using revegetation methodology with a potting system. [304-3]

Offshore Mine Reclamation

The implementation of offshore reclamation refers to the Marine Reclamation Plan document which includes:

  1. Bangka Sea Waters (Ministry of Energy and Mineral Resources Letter No. 472/37.06/DJB/2020 dated April 14, 2020): Marine Mining Business License (IUP) in Bangka Regency, West Bangka Regency, Central Bangka Regency, South Bangka Regency and Cross Regency Marine IUP.
  2. Karimun Kundur Sea Waters (Ministr y of Energy and Mineral Resources Letter No. 68/MB.07.09/DJB/2021 dated Januar y 12, 2021): Covers Kundur Island and Karimun Island.

Our Offshore reclamation refers to the Company’s internal standards. [304-3]